Elementary school Bosko Strugar
PROJECT NAME: | MEEP |
OBJECT TYPE: | School |
MUNICIPALITY: | Ulcinj |
YEAR OF REALIZATION OF WORKS: | 2013 |
SURFACE OF THE OBJECT (m2): | 2983 |
INVESTMENT (€): | 241422.23 |
SPECIFIC INVESTMENT (€/m2): | 80.93 |
ENERGY SAVINGS (kWh): | 0 |
APPLIED ENERGY EFFICIENCY MEASURES: |
The following EE measures were implemented:
- Joinery was replaced and sun shades were installed
- Thermal faced was installed
- Waterproofing of the roof of the school was performed
- Reconstruction of lighting was performed
- The existing AC units were removed and new units of split system were installed
|