High school Ivan Uskokovic
PROJECT NAME: MEEP
OBJECT TYPE: School
MUNICIPALITY: Podgorica
YEAR OF REALIZATION OF WORKS:  2012
SURFACE OF THE OBJECT (m2): 5758
INVESTMENT (€): 390246.57
SPECIFIC INVESTMENT (€/m2): 67.77
ENERGY SAVINGS (kWh):  0
APPLIED ENERGY EFFICIENCY MEASURES:

The following EE measures were implemented::

  • Joinery was replaced
  • Thermal insulation of facade was installed 
  • Thermal insulation and waterproofing of roof of the school was performed
  • Boilers were cleaned
  • Thermostatic radiator valves were installed
  • Automatic regulation related to operation of the boiler was performed
  • Distribution of fresh air and ventilation was performed 
PHOTOS: