Secondary Vocational School Cetinje
PROJECT NAME: | MEEP |
OBJECT TYPE: | School |
MUNICIPALITY: | Cetinje |
YEAR OF REALIZATION OF WORKS: | 2012 |
SURFACE OF THE OBJECT (m2): | 2646 |
INVESTMENT (€): | 191421.86 |
SPECIFIC INVESTMENT (€/m2): | 72.34 |
ENERGY SAVINGS (kWh): | 0 |
APPLIED ENERGY EFFICIENCY MEASURES: |
The following EE measures were implemented:
- Joinery was replaced
- Thermal facade was installed
- Gutters were replaced
- Electrical works were performed
- Thermostatic radiator valves were installed
- Automatic regulation related to operation of the boiler was performed
|