Elementary school Luka Simonovic
PROJECT NAME: MEEP
OBJECT TYPE: School
MUNICIPALITY: Nikšić
YEAR OF REALIZATION OF WORKS:  2012
SURFACE OF THE OBJECT (m2): 3834
INVESTMENT (€): 294042.45
SPECIFIC INVESTMENT (€/m2): 76.69
ENERGY SAVINGS (kWh):  0
APPLIED ENERGY EFFICIENCY MEASURES:

The following EE measures were implemented::

  • Joinery was replaced
  • Waterproofing of the flat roof was performed and evaporator was installed
  • Gutters were replaced and metal flashings were removed and installed
  • Thermostatic radiator valves were installed
  • Automatic regulation related to operation of the boiler was performed