Elementary school Luka Simonovic
PROJECT NAME: | MEEP |
OBJECT TYPE: | School |
MUNICIPALITY: | Nikšić |
YEAR OF REALIZATION OF WORKS: | 2012 |
SURFACE OF THE OBJECT (m2): | 3834 |
INVESTMENT (€): | 294042.45 |
SPECIFIC INVESTMENT (€/m2): | 76.69 |
ENERGY SAVINGS (kWh): | 0 |
APPLIED ENERGY EFFICIENCY MEASURES: |
The following EE measures were implemented::
- Joinery was replaced
- Waterproofing of the flat roof was performed and evaporator was installed
- Gutters were replaced and metal flashings were removed and installed
- Thermostatic radiator valves were installed
- Automatic regulation related to operation of the boiler was performed
|