Special hospital Vaso Cukovic - Risan
PROJECT NAME: MEEP
OBJECT TYPE: Hospital
MUNICIPALITY: Herceg Novi
YEAR OF REALIZATION OF WORKS:  2013
SURFACE OF THE OBJECT (m2): 5470
INVESTMENT (€): 291327.56
SPECIFIC INVESTMENT (€/m2): 53.26
ENERGY SAVINGS (kWh):  0
APPLIED ENERGY EFFICIENCY MEASURES:

The following EE measures were implemented:

  • Joinery was replaced
  • The accompanying construction and specialist trades were performed during the replacement of joinery, as follows; masonry works, painting works etc.
  • Works on reconstruction of the boiler room were performed, as follows: masonry works, carpentry, facade, roof covering, insulation, painting works etc.
  • Boiler room was reconstructed (new boilers were installed with supporting equipment)
  • Thermostatic radiator valves were installed on all radiators in the hospital
  • System of solar panels was installed
  • Electrical works were performed, as follows: electrical works in the boiler room and compensation of reactive energy