The following EE measures were implemented:
- Joinery was replaced
- Thermal insulation of facade was installed
- Thermal insulation was installed on the ceiling of last floors of the building
- All accompanying construction and specialists trades were performed during the works on the facade, as follows: replacement of gutters, sheet-metal work, painting works etc.
- New circulation pumps with variable speed drives were installed
- Installation of thermostatic radiator valves on all radiators in all pavilions of the hospital etc.
- Compensation of reactive energy was performed
|