General hospital Berane
PROJECT NAME: MEEP
OBJECT TYPE: Hospital
MUNICIPALITY: Berane
YEAR OF REALIZATION OF WORKS:  2010
SURFACE OF THE OBJECT (m2): 8670
INVESTMENT (€): 392415.7
SPECIFIC INVESTMENT (€/m2): 45.26
ENERGY SAVINGS (kWh):  0
APPLIED ENERGY EFFICIENCY MEASURES:

The following EE measures were implemented:

  • Joinery was replaced
  • Thermal insulation of facade was installed
  • Thermal and hydro insulation were installed under the roof
  • New sun shades were installed
  • Gutters were replaced
  • A part of the roof covering was replaced
  • New central boiler for preparation of hot, sanitary water with supporting equipment is installed
  • Thermostatic radiator valves were installed
  • Modernization of temperature regulation in the heating system is performed